
Repeat step 9.1 through 9.4 on the other side of
the greenhouse.
6
#S07
#S06
QTY
QTY
12
Cable Connector
Cable
QTY
1
Hex Key
From the inside of the greenhouse, insert long side of cable connector S06
into channel of profile L07A with hook facing the back. Slide connector to
other side of channel. Use hex key to securely tighten and hold in place.
Attach one side of long cable S07 to hook and lace behind profile L14B. Attach other side of cable to
a second S06 cable connector. With hook facing the front, insert connector into channel of profile L01C.
Repeat step 9.3 inserting cable connectors S06 into profile L07A with hook facing the front and into
profile L01C with hook facing the back. Cable rests behind profile L14A. Slide connector until profile
corners are square and cable is tight. Use hex key to securely tighten second connector to hold in place.
9.3A
9.3B
9.4
9.5
9.3C
Push towards center until profile corners are square and cable
is tight. Use hex key to securely tighten and hold in place.
L01C
L03A
L01C
L03A
43 of 55
www.stcny.com
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
IMPORTANT: Make sure all corners
are squared at 90 degrees.
IMPORTANT: Make sure all corners
are squared at 90 degrees.
L07A
L03A
L07A
L02A
L14B
L03A
L01C
L07A
L02A
L07A
L14B
L03A
L01C
L02A
L14B
L14A
L07A
L07B
L02A
L02B
L01C
L01C
L01C
L02A