
2.8B
2.8C
2.9A
Secure connectors with eight S02 screws.
S28
18 of 55
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
Place door profiles L13D, L13F, L13G and L13H next to connectors S28 around
Y26 panels as shown. Slide connectors into profiles. Make sure panels and profile
L05F fit into V-channels of each profile.
Slide hex nuts and
bolts into U-cutout in side of profiles
L13F and L13H. Tighten securely to hold in place.
Secure each S40 lock with two S40A screws.
Place S40 locks on profiles L13D and L13G as shown.
Center the levers so the screw holes are visible.
L13H
L13F
L13G
L13D
S40
L13G
S40
L13D
2.9B
Move lever to the right side to
place lock in the unlocked
position.
2.9C
2.8D
NOTE: Door locks are shown in the UNLOCKED
positition. When door is installed in step 15 and door
is closed, move lever to the left side to lock door.
IMPORTANT: Install door locks so levers face the panels.
S02
S40A
L13D
S40A
L13G
L13D
L13G
#S40
#S40A
QTY
4
2
8
Connector
QTY
Screw
#L13G
#L13F
#L13H
#S02
#S28
QTY
4
1
#L13D 1
1
Lock
QTY
Profile
QTY
Profile
1
S40
S40
L13H
L13D
L13G
L13F
L13F
L13G
L13D
S28
S28
S28
S28
Y26
Y26
L13H
L05F