10.
ACCESSORIES
!
The installation must comply with Standards EN 12453
and EN 12445.
When working in the box there are risks of cutting,
shearing, crushing hands due to the presence of moving
parts. Until the installation is completed, the partially
installed barrier must always be left blocked and with
the door and upper lid always closed to prevent access
to the electronic parts and the moving mechanical pars.
Never install the beam before fixing the barrier body and
checking it. Until the installation is complete never leave
the barrier unguarded with the beam fitted. Mark off
the work site and prohibit access/transit. If installation
is outside, it must be done in good weather without rain
or gusts of wind. If it is raining, an adequate shelter
for the barrier must be made until the mechanical and
electronic installation is complete.
Never manage the barrier by holding the board holder.
10.1
24V FLASHING LIGHT
"
The flashing light indicates that the automation is
moving.
Install the flashing light in an easily visible position.
1. (
44
) Connect the flashing light to terminal
clamp J16 (3 W max).
2. If required, set the preflash (
PF
Advanced pro-
gramming)
3. Check that the device is working properly.
10.2
EMERGENCY BATTERY XBAT 24
XBAT 24 ensures that the automation system is pow-
ered if there is a mains power supply failure. The
number of cycles that can be carried out with the
battery depends on various factors (state of battery
charge, time elapsing since the power outage, room
temperature etc.).
!
Recharge the battery before starting the system. The
full charging cycle of the XBAT 24 battery is 72 hours.
1. (
45
) Positioning the battery
2. Connect the battery to clamp J8 on the board
3. Set battery operation (
bF
Advanced programming)
Disconnect the emergency battery if the automation
system is taken out of use.