Page 43 of 74
4.9.21.
Install an adjustable elbow in the last open ramp handrail and align with the
adjustable elbow at the split between the Vertical Picket panels. Measure the gap
between the large round faces, cut a 1-1/2” diameter handrail tube to fit the gap and
install the handrail tube (FIG. 4.25). The procedure for installing the 1-1/2” diameter
handrail tubes and adjustable elbows is the same as the installing the closure top rail.
4.9.22.
Secure the Handrail Support Bracket to both the 1-1/2” diameter handrail tube and
the top rail of the Vertical Picket panel using two #8-18 x 1/2” hex washer head self-
drilling screws. Orient the attachment leg of the Handrail Support Bracket away from
the platform as shown (FIG. 4.26).
4.9.23.
Make sure all fasteners on both sides are tightened securely.
FIG. 4.25
FIG. 4.26
Содержание PATHWAY 3G SS06VP
Страница 15: ...Page 15 of 74 FIG 2 6 FIG 2 7...
Страница 35: ...Page 35 of 74 FIG 4 12 FIG 4 13...
Страница 36: ...Page 36 of 74 FIG 4 14 FIG 4 15...
Страница 46: ...Page 46 of 74 FIG 5 5...
Страница 51: ...Page 51 of 74 FIG 5 15 FIG 5 16 FIG 5 17...