Page 53 of 74
5.6.12.
Attach the tube with threaded inserts installed to the platform handrail post and the
horizontal picket closure bracket using 5/16”-18 x 1” long hex bolts and 5/16” flat
washers but do not tighten fully (FIG. 5.20).
5.6.13.
Repeat the steps above until all five 1
1/2″ diameter round tubes and curb have been
installed then tighten all fasteners securely. For the curb, use the hole which is 1/2”
above the lowermost hole in the platform post and horizontal picket closure bracket
to align the curb correctly.
FIG. 5.20
Содержание PATHWAY 3G SS06VP
Страница 15: ...Page 15 of 74 FIG 2 6 FIG 2 7...
Страница 35: ...Page 35 of 74 FIG 4 12 FIG 4 13...
Страница 36: ...Page 36 of 74 FIG 4 14 FIG 4 15...
Страница 46: ...Page 46 of 74 FIG 5 5...
Страница 51: ...Page 51 of 74 FIG 5 15 FIG 5 16 FIG 5 17...