Model OUM980 with OUSAF21 Inline Sensor
Installation
14
Figure 3.8: OUSAF21 Cable at Detector Side
3.6
Post-Connection Check
After wiring up the electrical connection, carry out the following checks:
Device Status and Specifications
Remark
Is the analyzer or the cable externally damaged?
Visual inspection
Electrical connection Remarks
Remark
Are the installed cables strain-relieved?
No loops or cross-overs in the cable run?
Are the signal cables correctly connected according to the wiring
diagram?
Are all screw terminals tightened?
Are all cable entries installed, tightened and sealed?
Are the PE distributor rails grounded (if present)? Grounding at place
of installation
Grounding at place of installation
Caution!
Improperly grounding will lead to unreliable measurement result!