Model OUM980 with OUSAF21 Inline Sensor
Commissioning
21
Reset New UV Lamp
Press
, enter function group selection menu. Move the cursor
to MAINTENANCE and press
to enter.
Press
to navigate to LAMP REPLACE, and press
.
The current lamp voltage will be displayed on the right upper
corner. The timer will start counting down once the
is
pressed to warm up the lamp.
Wait 30 minutes until the timer goes to 0:00
The current lamp voltage will be displayed in the first line and lamp
low threshold voltage will be calculated and display on the third
line.
Press
to accept the setting and use
to go back to
measurement screen. The LED and lamp alarm relay will be reset.
5.3
Analyzer Configuration and Operation
After power-up and lamp setting, you must make some settings to configure the most important functions of the analyzer which are
required for correct measurement.
The analyzer/sensor will be Plug& Play if been ordered together as complete solution!
If OUM980 Photometric Analyzer is ordered with OUSAF21 sensor and OUK20 cable, the factory will perform:
New lamp set up
Pathlength adjustment in analyzer according to sensor order
Calibrate analyzer
If application data has been given, factory will perform optical density to engineering unit correlation and deliver correlation data
with analyzer. There will be an additional charge if sample preparation is required. Span and relay setting also can be performed in
factory if requested. If analyzer ordered separately, the factory default setting will be loaded into the analyzer when analyzer is
delivered.