Installation
LT5
56
Hauser
5.12.1 Installing a measuring tape on a cone roof tank
Installation procedure
1. Insert the non-perforated side of the measuring tape directly into the tank from the
sheave elbow on the tank roof.
2. Insert the other end of the measuring tape (perforated and looped end) into the
gauge head through the sheave elbow on the gauge head.
3. Secure the end of the measuring tape to the tape drum. Rotate the tape drum twice,
and then pull the measuring tape inside the tank.
4. As for the length to the float, cut the measuring tape off, leaving approx. 1.5 m.
5. Connect the measuring tape to the float.
See → 57 for detailed connection instructions.
a
1
5
0
0
(5
9
.1
)
A0041209
41
Installation of measuring tape: for a measuring tape. Unit of measurement mm (in)
a
Guide pipe
a
1500 (59.1)
A0041210
42
Installation of measuring tape and measuring wire: for a measuring tape + measuring wire. Unit of
measurement mm (in)
a
Guide pipe