LT5
Installation
Hauser
27
5.6
Top anchor and anchor hook installation
When attaching the anchor hook, use a plumb, and lower the anchor hook so that it is
positioned vertically in relation to the top anchor.
The flange will be a socket type depending on specifications.
1
2
220 (8.66)
440 (17.32)
3
4
5
A0041183
25
Top anchor pre-installation check. Unit of measurement mm (in)
1
Nozzle flange for gauge head
2
Nozzle flange for top anchor
3
Tank top
4
Leveling line
5
Plumb
Socket (threaded type)
±5 (0.2)
220 (8.66)
220 (8.66)
440 (8.66)
440 (8.66)
1
2
4
3
5
A0041185
26
Installation of anchor hook. Unit of measurement mm (in)
1
1-1/2B socket
2
1B socket
3
Tank top
4
Guide wire (single wire)
5
Anchor hook