Installation
LT5
58
Hauser
5.12.3 Installation of measuring tape on a floating roof tank
Installation procedure
1. Send one end of the measuring wire into the tank by passing it through the 90°
sheave elbow on the gauge head to the sheave elbow on the tank roof.
2. Temporarily secure the other end in place.
3. Connect the measuring wire to the float inside the tank.
4. Connect the measuring wire to the measuring tape on top of the tank and feed the
measuring tape to the gauge head side.
5. Check to make sure that the measuring tape is not twisted.
6. Close the sheave elbow cover.
This completes the installation process.
2000 - 3000
(78.74 - 118.11)
440
(17.32)
>520 (20.47)
Ø400
(15.74)
300
(11.81)
100
(3.94)
8 (0.31)
1200 (47.24)
250
(9.84)
A
B
<700 (27.56)
PCD.44
Ø70
(2.76)
Ø10
(0.39)
8
C
30 - 40
(1.18 - 1.57)
30 - 40
(1.18 - 1.57)
1
2
3
4
6
7
9
10
5
3-
Ø1
1
A0041203
44
Measuring tape installation. Unit of measurement mm (in)
A
Wire guide metal
B
Top of the float
C
Measuring wire hook
1
Roof stand
2
Wire guide socket
3
FRT wire guide metal
4
Guide bar: φ16 mm (0.63)
5
Stainless steel wire (accessory)
6
Pipe end: 1
B
Sch 40-80
7
90 ° sheave elbow
8
Measuring tape
9
Gauge supporter
10 Gauge head