NOTICE
Line voltage, signal, and relay wiring must be rated for at least 221 °F (105 °C). Make sure that
the voltage and frequency of the AC power supply match the required power specifications.
NOTICE
If metal conduit is used with the power supply unit and/or the source unit, bond the conduit
reliably to protective earth. Grounding points inside the units are not bonded to PE and do not
provide adequate grounding.
2.7.1
Installation of cables
Decide routing for all non-power cables (both those supplied by Rosemount
™
and those
sourced locally). Use common routing wherever possible and install leaving sufficient free-
end length to make final connections.
Install power cables separately using different routes if possible to reduce the risk of cross-
interference. Leave sufficient free-end length to make final connections.
Rosemount supplied cables are provided with ferrite beads fitted to all cores to protect
against interference. Do not modify the cables without consulting Rosemount.
2.7.2
Cable connections
Use the following procedure to make cable connections between the source, receiver,
power supply unit, and control unit.
displays a system wiring diagram.
displays the location of power
supply and control unit connectors, etc.
Install
Reference Manual
19
Содержание Rosemount CCO 5500
Страница 1: ...Reference Manual 00809 0100 4550 Rev AA June 2018 Rosemount CCO 5500 Carbon Monoxide CO Analyzer ...
Страница 4: ......
Страница 8: ...Contents iv Rosemount CCO 5500 ...
Страница 28: ...System Wiring Diagram Figure 2 7 Install 20 Rosemount CCO 5500 ...
Страница 32: ...Install 24 Rosemount CCO 5500 ...
Страница 88: ...Operation 80 Rosemount CCO 5500 ...
Страница 98: ...Maintenance 90 Rosemount CCO 5500 ...
Страница 108: ...Troubleshooting 100 Rosemount CCO 5500 ...
Страница 110: ...Spare parts 102 Rosemount CCO 5500 ...
Страница 122: ...Return equipment to the factory 114 Rosemount CCO 5500 ...
Страница 123: ...Return equipment to the factory Reference Manual 115 ...