12
Installation and start-up
Weather Station Suntracer KNX sl
• Status: 14.07.2016 • Errors excepted. Subject to technical changes.
Drilling plan
ATTENTION! The printout of the data sheet does not have original size! A separate, di-
mensionally correct drilling plan is included ex works and this can be used as a tem-
plate.
Fig. 9 a+b
a) If the power lead is to be hidden when in-
stalled, it must emerge from the wall in
the vicinity of the rear of the housing
(marked area).
b) If the power lead is to be surface-mount-
ed, the cable guide is broken off. The lead
is then fed into the device at the under-
side of the housing.
Cable guide
Fig. 10
Feed the power lead through the rubber gas-
ket.
Rubber
gasket