63
10. Menu System
Full-electronic HV-Tester F1-1x Typs
10.5 Load parameter
After opening „Load parameter“, the operator must enter the password
for level 2 (parameters).
The menu is used for adding test steps. Test steps can be assembled
into test plans and in this way produce a defined test sequence (test plan
management). The related test steps must be defined for the individual
test types (HV, IS; PE; FK).
The existing test steps are listed in the field "Step" (for example HV-Steps).
Test step
- indicates the names of the test steps defined for the type (in
this case HV-step). Dependent of the kind of test (PE, IS, HV) eg. :
HV1200AC High voltage 1200 V; AC
- Select the required entry on the list.
You can move the entry marked in the list using
„UP - DOWN"
.
„
OK
“ - opens the test step. The test parameter screen is displayed. The
parameters allowed are displayed depending on the test type (HV; IS;
PE; FK) you have selected.
„
DEL
“ - deletes the entry marked
Fig. 10.11: Load parameter - editing and adding test steps