XRGI
®
- INSTALLATION GUIDE
VERSION 1.0 2018
4
1.
D O C U M E N TAT I O N I N F O R M AT I O N
This XRGI® installation guide provides detailed information about the individual XRGI® system components, their functions, assembling
and installation.
It provides important safety instructions that must be complied with when operating the XRGI® system and describes the interplay of
the Power Unit, the Q-Heat Distributor and the iQ-Control Panel as included in the standard scope of delivery. It also describes certain
accessories, the Q-Network modules and the storage tank, which may be required depending in the individual installation.
Please read this XRGI® installation guide carefully before installation and commission.
Only a correct assembling, installation and operation of the XRGI® system according to the specifications from EC POWER ensures proper
functioning and a valid warranty. Please keep this XRGI® installation guide for later reference. EC POWER continuously improves its pro-
ducts and reserves the right to make technical changes and to implement these changes if considered necessary. This means that the
company is not bound to make retrospective changes to already delivered XRGI® systems.
The following information’s are a guide through the entire documentation. In connection with this XRGI® installation guide. In connec-
tion with this XRGI® installation guide, other accompanying documents must be followed. EC POWER cannot take responsibility for any
damages caused by non-compliance with the instructions for the XRGI® system.
1.1
O R I G I N A L O P E R AT I N G I N S T R U C T I O N
1.2
A P P L I C A B L E D O C U M E N T S
1.3
K E E P T H E D O C U M E N T S
1.4
S Y M B O L S U S E D
1.5
R AT I N G P L AT E
This XRGI® installation guide contains original operating instructions in accordance with the Machinery Directive.
When installing the XRGI® system, all installation instructions for additional components and components of the XRGI® system must
be complied with. These installation instructions are attached to the respective components of the XRGI® system and additional
components.
Please note all operating instructions that come with the components of the XRGI® system.
These documents are subject to technical modifications!
Due to the continuous development of the XRGI® systems, illustrations, functional steps and technical data may differ slightly.
Pass on this XRGI® installation guide and all applicable documents to the system operator.
The system operator keeps the XRGI® installation guide and other instructions for future reference so that they are available when
needed.
The following explains the symbols used in the text.
I N F O !
Symbol for important and useful information about the issue.
P O W E R U N I T
The rating plate is located on the back of the Power Unit.
L e g e n d
1
Power Unit serial no.
2
Type description of the XRGI® system
3
Description of the type approval
4
Technical data of the Power Unit
5
CE marking
1
3
4
2
5
Fig. 1.01 – Power Unit rating plate
Содержание XRGI 15
Страница 1: ...I N S T A L L A T I O N G U I D E 01DOC1043 VERSION 1 0 2018 FOR PROFESSIONALS ...
Страница 31: ...XRGI INSTALLATION GUIDE VERSION 1 0 2018 31 ...
Страница 61: ......
Страница 62: ...I N S T A L L A T I O N G U I D E FOR PROFESSIONALS ...