dormakaba ED250 IG Installation Instructions
Chapters 26 and 27
26 Install door threshold
26.1 Install door threshold
NOTICE
• Threshold supplied by customer /
contractor.
• Customer / contractor installation
responsibility.
NOTICE
Refer to Warranty Guidelines, page 3 for
threshold manufacturing and installation
requirements.
CAUTION
• Cement case cover must be installed and
sealed (Chapter 24).
• Blockout should be free of debris.
26.1.1 Install threshold over blockout and cement
case.
CAUTION
Threshold fasteners cannot contact cement
case or cement case covers.
26.1.2 Threshold seal at spindle.
CAUTION
Spindle opening at threshold must be sealed
with an O-ring or similar device.
26.1.2.1 Seal perimeter of threshold.
1. Seal entire perimeter of threshold with silicone
sealant.
Fig. 26.1.3 Threshold installed end view example
Fig. 26.1.1 Threshold example for ED250 in-ground
Fig. 26.1.2 Threshold installed example for ED250
in-ground
Threshold
Spindle
27 Install door signage
27.1 Install door signage
27.1.1 Install door signage based on type of door
installation.
Install applicable door signage as outlined in Chapter
12, ED250 door signage.