46
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Chapter 16
1 3/4”
1
Interior
Door face
2
3
1
Cement case spindle
2
Bottom arm
3
Slide track
4
Jamb
Fig. 16.4.3 LH slide arm and track, alignment of spindle with face of door
2 3/4”
3
2
1
4
Fig. 16.4.4 LH slide arm and track, alignment of spindle with door face front view
1
Cement case spindle
2
Bottom arm
3
Slide track
4
Jamb
16.4.2 Slide arm and track; locate center
of cement case spindle
1. Referencing contractor or customer
drawings, establish location of interior
door face .
2. Locate center of cement case spindle
1 3/4" from door face for any door
thickness and 2 3/4" from face of jamb.
CAUTION
After establishing spindle location:
• Level and plumb cement case
in all directions.
• Cement case must be parallel
with door header.
• Secure cement case in position.
Fig. 16.4.5 LH slide arm and track, alignment of spindle with door face overhead view
1
Cement case spindle
2
Bottom arm
3
Slide track
4
Jamb
3
2
Interior door face
1
1 3/4”
Face of jamb
2 3/4”
TIPS AND RECOMMENDATIONS
1. Para. 16.4.2 is for butt hinge
and 3/4" offset pivot doors
using Dorma bottom arms and
slide track.
2. Spindle may not be at
centerline of jamb.
3. Jamb widths vary. Cement
case placement dimensions
are from face of jamb to
centerline of spindle.