45
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Chapter 16
16.4 Locate center of cement case spindle
1
1
2
1
2
3
4
Fig. 16.4.1 LH offset pivot door, alignment of spindle with top pivot
1
Cement case spindle
2
Top door pivot in frame
3
Door header
4
Cement case
5
Blockout
16.4.1 Offset and center hung arms; align
top door pivot with spindle.
1. Verify cement case spindle location
referencing door jambs with contractor
or customer drawings.
2. Using laser or plumb bob, center cement
case spindle with center of top door
offset pivot.
CAUTION
After centering spindle:
• Level and plumb cement case
in all directions.
• Cement case must be parallel
with door header.
• Secure cement case in position.
2
1
5
3
4
1
2
Fig. 16.4.2 LH center hung door, alignment of spindle with top pivot
1
Cement case spindle
2
Top door pivot in frame
3
Door header
4
Cement case
5
Blockout
Refer to Chapter 13, installation templates.