10
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Chapter 4
Fig. 4.2.1 Door with center hung arm
Fig. 4.2.1.1 Overhead view
1
ED250 in-ground
cement case
2
Blockout
5
Door frame
6
Center hung arm
9
Top of door and
door frame
hardware
(by others)
Threshold not shown
4.2 ED250 in-ground single swing door with center hung arm
Fig. 4.3.1 LH door with arm and track
4.3 ED250 in-ground single swing door with arm and track
Fig. 4.3.1.1 Overhead view, door closed
1
ED250 in-ground
cement case
2
Blockout
3
Door
4
Butt hinge
(by others)
7
Track
8
Arm
9
Threshold
(by others)
Fig. 4.3.2 RH door with arm and track
Fig. 4.3.2.2 Front view
7
8
1
2
3
Fig. 4.3.1.2 Front view
2
1
7
8
Fig. 4.3.2.1 Overhead view, door closed
1
2
7
8
3
4
6
1
6
9
1
5
8
7
2
1
1
6
2
9
7
8
4
1
ED250 in-ground
cement case
2
Blockout
3
Door
4
Butt hinge
(by others)
7
Track
8
Arm
9
Threshold
(by others)
9
7
8
4