49
ED250
08-2018
DL4614-070
dormakaba ED250 IG Installation Instructions
Chapter 16
16.9.1
Installation of 115 Vac conduit
from blockout to cement case.
NOTICE
• Only one cement case requires
115 Vac liquidtight conduit and
wiring from blockout.
• 115 Vac cable connects the
two ED250 operators
(Fig. 16.9.2).
• Reference Para. 16.14 for
installation.
WARNING
Installation of 115 Vac conduit and
fitting and termination of wiring
must be done by qualified
personnel.
WARNING
115 Vac power source for ED250
must be OFF!
1. Install 115 Vac conduit and wiring into
selected cement case per Para. 16.8.
2. Route 115 Vac wiring into cement case
and terminate per Para, 16.8.
1
ED250
115 Vac power
cable ,11'
DX3484-030
1
Fig. 16.9.2 Double door 115 Vac power cable
Fig. 16.9.3 Power connection board
1
115 Vac power
connection board
2
Power off/on switch
3
Socket for 115 Vac
power connection
cable
2
1
3
3
16.9 Double doors, install and terminate 115 Vac liquidtight conduit and
wiring
1
Accessory wiring
terminal board
2
Power off/on switch
3
115 Vac liquidtight
fitting (by others)
Fig. 16.9.1 Cement case 115 Vac liquidtight
fitting
3
2
1