User Information
Load-bearing tower Staxo 40
Assembling towers in the upright
47
999805002 - 09/2018
Horizontal bracing
➤
Slot diagonal crosses onto the safety-catch bolts of
the horizontal frame tubes, and fix them in place.
Head zone
Fitting the head unit
➤
Insert the head unit.
Dismantling
To dismantle, perform the above steps in reverse order.
NOTICE
If no scaffold planking units are used, or if
these are removed before the tower is finally
put into use, the following rule applies.
Basic rule:
To maintain correct geometry, horizontally placed
Diagonal crosses 12.xxx or shear-rigid planking units
must be fitted in the following cases:
▪
in the bottom and top 'storeys'
▪
every 10
m
▪
in between as required, e.g. where
- the tower is anchored to one side (even tempo-
rarily)
- local loads need to be transferred (e.g. from a
bracket or from attaching the tower to the crane
when it is assembled in the horizontal)
K
Diagonal cross
K
98024-254-01
J
Head unit
WARNING
Loads that are applied non-centrally can cause
overloading of the system.
➤
Ensure that all loads are applied centrally!
NOTICE
➤
When lifting and repositioning the entire
tower unit (or pre-assembled sub-units) by
crane: Follow the instructions in the section
headed 'Lifting by crane'!
NOTICE
As early as in the planning phase, considera-
tion should also be given to the dismantling
operations (e.g. travelling/towing the load-
bearing tower/unit into the reach of the crane
for safe repositioning or for horizontal on-
ground dismantling)!
980024-253-01
J
9776-102-01