User Information
Load-bearing tower Staxo 40
Assembling towers in the upright
41
999805002 - 09/2018
Erecting the second storey
Stacking the frames
➤
Add the next frames.
➤
Push diagonal crosses onto the bottom safety-catch
bolts and secure them with the safety catches.
➤
Insert Staxo 40 couplers in the same way as in the
first 'storey'.
Bracing the frames in the vertical
➤
Mount the scaffold planking units.
➤
Close the anti-liftout guard.
➤
Push diagonal crosses onto the top safety-catch
bolts and secure them with the safety catches.
➤
Insert Staxo 40 couplers.
Erecting the third 'storey'
Stacking the frames
➤
Add 1.20
m frames in the same way as for the 2nd
section.
➤
Push diagonal crosses onto the bottom safety-catch
bolts and secure them with the safety catches.
Mounting scaffold planking units and bracing
the frames in the vertical
➤
Place scaffold planking on the finished 'storey'.
➤
Push diagonal crosses onto the top safety-catch
bolts and secure them with the safety catches.
➤
Insert Staxo 40 couplers.
F
Diagonal cross
F
Diagonal cross
G
Scaffold planking 30/...cm
H
Scaffold planking 60/...cm with manhole
98024-261-01
F
98024-295-01
980 -2 -01
24 60
G
F
H
F
Diagonal cross
F
Diagonal cross
G
Scaffold planking 30/...cm
H
Scaffold planking 60/...cm with manhole
980 -2 -01
24 59
F
G
980 -2 -01
24 58
F
H