54
999805002 - 09/2018
Repositioning
User Information
Load-bearing tower Staxo 40
Mount the Lifting rod 15.0
➤
Mount the Lifting rod 15.0 and Retaining plate 15.0.
Repositioning operation
➤
Attach the crane sling to the Lifting rods 15.0 and lift
the tableform to its next location. Spread-angle β
max. 30°.
A
Lifting rod 15.0
B
Retaining plate 15.0
Use a 20
mm diam. bit to drill the hole through
the form-ply. It can later be filled with a Univer-
sal plug R20/25.
Follow the directions in the Operating Instruc-
tions!
9720-276-01
5.1
5.1
A
B
While the tableform is being lifted, there must
NOT be any loose parts, tools or
other items on the tableform!
98024-231-01
b