The information contained here are property of DIGITAX Automotive Electronics Italy, and extremely con
fi
dential. Any disclosure, copying, distribution to third
party is strictly prohibited.
39
117
Insert as percentage in Prog-Date 7 with K1
- Passing from Hired to Stopped in Prog-Date 7 should the parameter of Q.109 be inserted as a
percentage pressing K1?
No / Yes
PROG-DA TE N. 8
118
Block-number in Prog-Date 8
-The block number (absolute) to be used during the date and hour programmed in Prog-Date 8. The allowed
value goes from 0 (min) to 62 (max).
0 - 62
119
Block-o
ff
set in Prog-Date 8
: the block o
ff
set (rela ve) to be used during the date and hour programmed in Prog-Date 8. The rela ve block o
ff
set
is the number of blocks to add to the current block number in order to obtain the new block number. The allowed value goes from 0 (min) to
62 (max).
0 - 62
120
Percentage or cost in Prog-Date 8
. this is the percentage or the cost that will be applied during the date and me as programmed in Prog-Date
8. The interpreta on as a percentage or as a cost depends on ques ons Q.121 to Q.128. In case of percentage consider Q.121 to Q.124, Q.126
and Q.128. Ques ons Q.125 and Q.127 should be answered with: NO. In case of cost consider Q.125 and Q.127. Ques ons Q.121 to Q.124,
Q.126 and Q.128 should be answered with: NO. The cost is given in the local currency with an accuracy of 1. The allowed value goes from 0
(min) to 65535 (max). See Q.273 and Q.274 for adding a
fi
xed decimal point. The percentage is given with an accuracy of 0.1. The allowed value
goes from 0 (min) to 6553.5 (max).
0 - 65535
percentage/
cost
121
Increase unit-cost in Prog-Date 8
- Should the unit-cost (Q.8 to Q.10) in Prog-Date 8 be increased based on the percentage (Q.120)?
No / Yes
122
Increase ini al-cost in Prog-Date 8
- Should the ini al-cost (Q.11) in Prog-Date 8 be increased based on the percentage (Q.120)?
No / Yes
123
Decrease unit-distance in Prog-Date 8
- Should the unit-distance (Q.2 to Q.4) in Prog-Date 8 be decreased based on the percentage (Q.120)?
No / Yes
124
Decrease unit-wai ng- me in Prog-Date 8
- Should the unit-wai ng- me (Q.5 to Q.7) in Prog-Date 8 be decreased based on the percentage
(Q.120)?
No / Yes
125
Insert as
fi
xed cost in Prog-Date 8
- When passing from HIRED to STOPPED in Prog-Date 8 should the parameter of Q.120 be inserted as a
fi
xed cost?
No / Yes
126
Insert as percentage in Prog-Date 8
- When passing from HIRED to STOPPED in Prog-Date 8 should the parameter of Q.120 be inserted as a
percentage?
No / Yes
127
Insert as
fi
xed cost in Prog-Date 8 with K1
- Passing from HIRED to STOPPED in Prog-Date 8 should the parameter of Q.120 be inserted as a
fi
xed cost pressing K1?
No / Yes
128
Insert as percentage in Prog-Date 8 with K1
- Passing from HIRED to STOPPED in Prog-Date 8 should the parameter of Q.120 be inserted as a
percentage pressing K1?
No / Yes
Prog-Dat e priority ManagemeNt
129
Priority of Prog-Date 1 (night- me)
- This is the number that corresponds with the priority that Prog-Date n. 1 has with respect to the other
Prog-Dates. The allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those
Prog-Dates have the same priority.
No / Yes
130
Priority of Prog-Date 2 (holiday- me)
- This is the number that corresponds with the priority that Prog-Date n. 2 has with respect to the other
Prog-Dates. The allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those
Prog-Dates have the same priority.
No / Yes
131
Priority of Prog-Date 3
-This is the number that corresponds with the priority that Prog-Date n. 3 has with respect to the other Prog-Dates. The
allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those Prog-Dates
have the same priority.
No / Yes
132
Priority of Prog-Date 4
-This is the number that corresponds with the priority that Prog-Date n. 4 has with respect to the other Prog-Dates. The
allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those Prog-Dates
have the same priority.
No / Yes
133
Priority of Prog-Date 5
- This is the number that corresponds with the priority that Prog-Date n. 5 has with respect to the other Prog-Dates.
The allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those Prog-Dates
have the same priority.
No / Yes
134
Priority of Prog-Date 6
- This is the number that corresponds with the priority that Prog-Date n. 6 has with respect to the other Prog-Dates.
The allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those Prog-Dates
have the same priority.
No / Yes
135
Priority of Prog-Date 7
- This is the number that corresponds with the priority that Prog-Date n. 7 has with respect to the other Prog-Dates. The
allowed number goes from: 8 (min. priority) to: 1 (max. priority). If two or more Prog-Dates have the same number then those Prog-Dates
have the same priority.
No / Yes
Содержание M1 mdt
Страница 1: ...Technical Manual InstallationandProgramming ver 1 16 12 2014...
Страница 2: ......
Страница 83: ......