3. INSTALLATION
Page 43
© 2005 - 2007 DH Instruments, a Fluke Company
Connect the 9 pin D-sub cable labeled
PG COM2
to the
COM2
port on the rear of the
PG7601 Platform.
Connect the 9 pin D-sub cable labeled
PG COM3
to the
COM3
port on the rear of the
PG7601 Platform.
Connect the 9 pin D-sub cable labeled
FPG COM1
to the
COM1
port on the rear of the
FPG8601 Platform.
Connect a 14 AWG/20 A power cord from the rear of the turbo pump controller enclosure
to the
AC2 REFERENCE ROUGHING PUMP CONTROLLER
socket on the rear of the
Control Cabinet.
Do NOT
connect it to the
AC2 REFERENCE TURBO PUMP
CONTROLLER
socket.
Connect the reference vacuum roughing pump cord to one of the two power sockets on
the rear of the turbo pump controller enclosure.
Connect the power cord from the power strip under the Reference Bench to the
AC1
BENCH INSTRUMENTS
socket on the rear of the Control Cabinet.
Connect 14 AWG/20 A power cords from the
AC1
,
AC2
and
AC3
IEC connectors on the
rear of the Control Cabinet to a 110 V, 60 Hz power supply.
Power up the Control Cabinet by operating the
REFERENCE BENCH (AC1)
power
switch on the front, top, left of the cabinet. The two PPC3 pressure controllers and the
RPM4 reference pressure monitor will power up and go to their main run screens.
Do
NOT
operate either of the
PUMP (AC2, AC3)
power switches.
3.3.7
CONNECT PRESSURE SUPPLIES TO CONTROL CABINET
Connect a drive air supply to the
DRIVE AIR SUPPLY
port on the rear of the Control
Cabinet. The fitting is a 1/4 in. NPT F. The connecting tube and adaptor are not
supplied. See Section 1.1.1 for drive air supply requirements.
Connect an instrument gas supply to the
TEST GAS SUPPLY
port on the rear of the
Control Cabinet. The fitting is a 1/4 in. NPT F. The connecting tube and adaptor are not
supplied. See Section 1.1.1 for test gas supply requirements.
3.3.8
APPLY SUPPLY PRESSURES AND CHECK GAS SUPPLY
PANEL SETTINGS
Once the TEST GAS SUPPLY has been applied, do not interrupt it without following the
procedure described in Section 6.11.
Open the door on the front of a Control Cabinet to access the Control Panel. Key to the
door lock is stored inside the door. Verify that the
AMH DRIVE
and
FPG LUBRICATION
regulators on the Control Panel are off (regulator set fully counter clockwise).
Apply the supply pressure to the
SUPPLY
ports on the rear of the Control Cabinet (see
Section 3.3.7, Steps 1, 2).
Leave the
AMH DRIVE
and
FPG LUBRICATION
regulators set to zero. Check and
adjust the other Control Panel regulator settings as necessary. See Section 6.13 for
definition of correct settings.
Содержание ADCS-601-AF
Страница 10: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page VIII N NO OT TE ES S...
Страница 12: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page X N NO OT TE ES S...
Страница 114: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 102 N NO OT TE ES S...
Страница 116: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 104 N NO OT TE ES S...
Страница 146: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 134 N NO OT TE ES S...
Страница 168: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 156 N NO OT TE ES S...
Страница 174: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 162 N NO OT TE ES S...