ADCS-601-AF™ OPERATION AND MAINTENANCE MANUAL
© 2005 - 2007 DH Instruments, a Fluke Company
Page 88
A Test Definition test has the test parameters and pressure sequence pre-
defined (see Section 4.4.1). To run a Test Definition test, a DUT Definition and
Test Definition must have been created (see Section 4.4.1.1, 4.4.1.2).
To run a Test Definition select
[Run]
,
[Run Test Definition]
. The run process
has three main steps:
Test
Initialization:
Steps through screens to:
- Select unit of measure. When running a Test Definition, the unit specified
by the Test Definition is always used to log data.
- Specify user.
- Select DUT(s) to be tested. Double click DUTs in the grid to add them to
the list of DUTs to be tested.
- Configure DUT(s). Specifies details specific to the DUT being tested.
- Select Test Definition to be run. By default, the Test Definition specified
in the DUT Definition is selected. Double click the desired Test Definition.
- After the Test Definition has been selected, most ADCS-601-AF users
can
press
[Finish]
to skip remaining initialization steps and go directly to
running the test.
Run Test Sequence:
Runs leak test (if included) and pressure exercise (if
included) followed by the test points taking data at each point based on the
test data selections. The test parameters are defined by the Test Definition
(see Section 4.4.1.2).
End
Test:
Presents the Test Notes screen to record test specific notes and
the Test Complete
screen with various test conclusion options. Certain
aspects of the test conclusion can be customized using the
[Tools]
,
[Test
Options]
,
[End Test]
tab (see Section 4.4.1.4).
4.4.3
TEST RUN SCREENS
Special run screens are available when running an automated test.
The
Data Plot
and
Data Grid Run Screens
are available when running any automated test
for which there is a data file. These run screens visualize test results while the test is
running.
The
DUT/Reference Comparison Run Screen
is available when running any automated
test, regardless of whether there is a data file. This screen provides real time DUT and
ADCS-601-AF readings and information on the agreement between them.
See Section 4.4.3.1 for information on the
Data Plot Run Screen
, Section 4.4.3.2 for
information on the
Data Grid Run Screen
and Section 4.4.3.3 for information on the
DUT/Reference Comparison Run Screen
.
Содержание ADCS-601-AF
Страница 10: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page VIII N NO OT TE ES S...
Страница 12: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page X N NO OT TE ES S...
Страница 114: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 102 N NO OT TE ES S...
Страница 116: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 104 N NO OT TE ES S...
Страница 146: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 134 N NO OT TE ES S...
Страница 168: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 156 N NO OT TE ES S...
Страница 174: ...ADCS 601 AF OPERATION AND MAINTENANCE MANUAL 2005 2007 DH Instruments a Fluke Company Page 162 N NO OT TE ES S...