- 35 -
General Principles
Operating manual describes all operating procedures for CPM 310 G relays; starting from the
mounting and cabling stages to maintenance and test procedure.
Operation stages are shown on the below figure to visualize handling of the product free of problems.
Each stage is discussed thoroughly at the belonging section.
For feed-back on the operation manual, or technical assistance requests, please do not hesitate to call
our technical support department.
Product Manager
Elec. Eng. Necati Ozbey
Phone
(+90) (216) 352 77 34
(+90) (216) 352 77 35
Fax.
(+90) (216) 442 17 95
WEB
□
Testing, Maintenance and Reparation, p.52
Operating, p.51
Commissioning, p.50
Setting, p.43
Cabling, p.38
Mounting, p.36
Содержание CPM 310 G
Страница 1: ...CPM 310 G Digital Overcurrent Protection Relay User Application Manual vEN 2016 03...
Страница 2: ...2...
Страница 6: ...6 ABOUT DEMA...
Страница 11: ...11 INTRODUCTION...
Страница 32: ...32 PACKING LABELING INFORMATION...
Страница 34: ...34 OPERATING MANUAL...
Страница 53: ...53 RELAY MENUS MANUAL...
Страница 55: ...55 The Menu Tree...
Страница 56: ...56...
Страница 57: ...57...
Страница 58: ...58...
Страница 59: ...59...
Страница 60: ...60...
Страница 61: ...61...
Страница 128: ...128 DIGICONNECT PC PROGRAM MANUAL...
Страница 189: ...189 APPLICATION DIAGRAMS...
Страница 191: ...191 Sample Power Transformer Protection Application Diagram...
Страница 193: ...193 FUNDAMENTAL CABLING DIAGRAM...
Страница 195: ...195 APPLICATION DIAGRAM NO 2 Function Function Activation Address Output Settings Internal Error Alarm Automatic...
Страница 203: ...203 APPLICATION DIAGRAM NO 10 RS485 Cabling...
Страница 204: ...204 TECHNICAL DATA...
Страница 220: ...220 GLOSSARY...