2
|
Components
Service manual
110
FTXF20~71A + FTXF20~25B + FTXF20~42C + ATXF20~71A + ATXF20~42C
+ RXF20~71A + RXF20~60B + RXF20~42C + ARXF20~71A + ARXF20~42C
Split Sensira R32
ESIE18-12E – 2021.02
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
101].
1
Disconnect the power supply wiring from the power supply terminal X1M.
2
Pull the clip and remove the heat exchanger thermistor from its holder.
3
Remove the screws to disconnect the grounding wires from the heat
exchanger.
a
a
b
c
d
e
a
Grouding wire screw
b
Heat exchanger thermistor
c
Indoor unit PCB
d
Switch box screw
e
Switch box
4
Disconnect the connectors of the indoor unit fan motor, the swing flap motor
and the swing raster motor (if equipped) from the indoor unit PCB.
5
Remove the screw and remove the switch box from the indoor unit.
6
To install the switch box, see
101].
To install the switch box
1
install the switch box in the correct location on the indoor unit.
a
a
b
c
d
e
a
Grouding wire screw
b
Heat exchanger thermistor
c
Indoor unit PCB
d
Switch box screw
Содержание Sensira Series
Страница 169: ......
Страница 170: ......
Страница 171: ......
Страница 172: ...ESIE18 12E 2021 02 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...