2
|
Components
Service manual
113
FTXF20~71A + FTXF20~25B + FTXF20~42C + ATXF20~71A + ATXF20~42C
+ RXF20~71A + RXF20~60B + RXF20~42C + ARXF20~71A + ARXF20~42C
Split Sensira R32
ESIE18-12E – 2021.02
d
d
c
e
a
b
c
d
c
d
e
e
e
c
a
L803
b
L804
c
Measuring point
d
Measuring point
e
Measuring point
Is the resistance measurement correct? Action
Yes
Proceed with the next step.
No
114].
4
Measure the inductance of the reactor using an LCR meter.
Result:
The inductance MUST be as follows:
Measuring points
Resistance
c‑d
88.5~101.5 µH
d
d
c
c
a
b
c
d
c
d
a
L803
b
L804
c
Measuring point
d
Measuring point
Is the inductance measurement
correct?
Action
Yes
Return to the troubleshooting of the
specific error and continue with the
next step.
No
114].
Содержание Sensira Series
Страница 169: ......
Страница 170: ......
Страница 171: ......
Страница 172: ...ESIE18 12E 2021 02 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...