Version log
Service manual
3
FTXF20~71A + FTXF20~25B + FTXF20~42C + ATXF20~71A + ATXF20~42C
+ RXF20~71A + RXF20~60B + RXF20~42C + ARXF20~71A + ARXF20~42C
Split Sensira R32
ESIE18-12E – 2021.02
Version log
Version code
Description
Date
ESIE18-12
Document release
October 2018
ESIE18-12B
See below
June 2019
The following updates have been applied to the Service Manual:
•
Outdoor unit models RXF50B and RXF60B added.
•
Indoor unit models ATXF25A and ATXF35A added.
•
Technical data – Wiring diagram: Wiring diagrams for new models added.
•
Technical data – Piping diagram: Piping diagrams for new models added.
Version code
Description
Date
ESIE18-12C
See below
February 2020
The following updates have been applied to the Service Manual:
•
Outdoor unit models RXF20+25B added.
•
Indoor unit models 25B added.
•
Inverter PCB – Checking procedures: To perform an electrical check of the inverter PCB updated.
•
Outdoor unit fan motor: Checking procedures updated.
•
Technical data – Wiring diagram: Wiring diagrams for new models added.
•
Technical data – Piping diagram: Piping diagrams for new models added.
Version code
Description
Date
ESIE18-12D
See below
March 2020
The following updates have been applied to the Service Manual:
•
Outdoor unit models ARXF20~71A added.
•
Indoor unit models ATXF20A and ATXF50~71A added.
•
Technical data – Wiring diagram: Wiring diagrams for new models added.
•
Technical data – Piping diagram: Piping diagrams for new models added.
•
Technical data – Piping diagram: Piping diagram for models RXF20+25B updated.
Version code
Description
Date
ESIE18-12E
See below
February 2021
The following updates have been applied to the Service Manual:
•
Outdoor unit models RXF20~42C and ARXF20~42C added.
•
Indoor unit models FTXF20~42C and ATXF20~42C added.
•
Technical data – Wiring diagram: Wiring diagrams for new models added.
•
Technical data – Piping diagram: Piping diagrams for new models added.
•
High pressure switch – Checking procedures: To perform an electrical check of the high pressure switch updated
(ope reset pressure values added).
•
4-way valve – Checking procedures: To perform an electrical check of the 4-way valve updated.
•
Main PCB: Class 20~42 unit procedures updated.
•
Main PCB: Class 50~71 unit procedures added.
•
Outdoor unit fan motor – Checking procedures for Class 50~71units: To perform an electrical check of the
outdoor unit fan motor updated (resistance values updated)
•
Indoor unit fan motor: Checking procedure updated.
•
Reactors – Checking procedures: To perform an electrical check of the reactor updated.
•
Reactors – Repair procedures: To remove and to install the reactor updated.
•
Maintenance: To clean the indoor unit heat exchanger in extreme condition added.
Содержание Sensira Series
Страница 169: ......
Страница 170: ......
Страница 171: ......
Страница 172: ...ESIE18 12E 2021 02 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...