Unit Maintenance
www.DaikinApplied.com 99
IM 1287-4 • REBEL APPLIED ROOFTOP
Restart
After extended storage, perform a complete start up. Inevitable
accumulations of dirt, insect nests, etc. can contribute to
problems if not cleaned out thoroughly prior to start up. In
addition, thermal cycling tends to loosen mechanical and
electrical connections. Following the startup procedure helps
discover these and other issues that may have developed
during the storage interval.
Gas Furnace
For information on maintenance of the gas furnace, refer to
“Daikin Tubular Gas Heater Series” on page 111
On Daikin equipment that includes the extended 2nd -5th year
compressor warranty option, the replacement compressor must
be ordered through the Daikin Parts Department (Minneapolis).
1. Contact the Daikin Parts Department for compressor
availability.
2. Send the Daikin Parts Department a completed parts
order form.
3. The Parts Department will process the order and the
compressors will be shipped from our Dayton, OH
warehouse via ground transportation. If next-day air is
required, you will need to indicate this on the parts order
form and a freight charge will be billed to your account.
Air freight costs are not covered under the Daikin
warranty.
4. After the failed compressor has been replaced, it must
be returned to Daikin with a Return Goods Tag attached.
You will receive the tag in the mail and it must be
attached to the compressor. The Return Goods Tag will
have instructions on where to send the compressor. If
the compressor is not returned, you will be billed for the
replacement compressor.
5. Consideration may be given at this time to a compressor
teardown analysis, depending on the history of failures.
Содержание Rebel Applied DPSA
Страница 15: ...Introduction www DaikinApplied com 15 IM 1287 4 REBEL APPLIED ROOFTOP Figure 17 VFD Inverter Box Components ...
Страница 109: ...Unit Maintenance www DaikinApplied com 109 IM 1287 4 REBEL APPLIED ROOFTOP Figure 159 10kW 50kW Full SCR Control ...
Страница 144: ...IM 1287 4 REBEL APPLIED ROOFTOP 144 www DaikinApplied com Furnace Wiring Diagrams Figure 178 600 MBH 2 Stage ...
Страница 145: ...Furnace Wiring Diagrams www DaikinApplied com 145 IM 1287 4 REBEL APPLIED ROOFTOP Figure 179 600 MBH 4 Stage ...
Страница 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...
Страница 160: ......
Страница 161: ......