
IM 1287-4 • REBEL APPLIED ROOFTOP 32 www.DaikinApplied.com
Installation
7. Place and fasten deck panel to base (
). All
fasteners in the deck panel need to be fastened to a
torque of 35 in·lbs and approximately flush with the deck
sheet-metal.
Figure 49: Install Deck Panel to Base
8.
Remove internal stiffeners and recycle.
Figure 50: Remove Stiffeners
9. Place and fasten roof panels. There are 4 fasteners per
side from the top down. Use proper ladder techniques
to reach and secure these fasteners. There will be 14
fasteners in the air tunnel (pointed up). All of the holes
should be used.
Figure 51: Install Roof Panels
10. Add rain covers (
(
) to prevent leaks from rain or moisture. Tip
hemmed lip in under previous rain cover (
Figure 52: Install Rain Covers
Figure 53: Standing Seam
11. Use the provided #10 sheet metal screws to secure the
rain cover to the roof panels (up to 4 per side). Use the
same screws to secure the standing seam (
Figure 54: Fasten Standing Seam
Содержание Rebel Applied DPSA
Страница 15: ...Introduction www DaikinApplied com 15 IM 1287 4 REBEL APPLIED ROOFTOP Figure 17 VFD Inverter Box Components ...
Страница 109: ...Unit Maintenance www DaikinApplied com 109 IM 1287 4 REBEL APPLIED ROOFTOP Figure 159 10kW 50kW Full SCR Control ...
Страница 144: ...IM 1287 4 REBEL APPLIED ROOFTOP 144 www DaikinApplied com Furnace Wiring Diagrams Figure 178 600 MBH 2 Stage ...
Страница 145: ...Furnace Wiring Diagrams www DaikinApplied com 145 IM 1287 4 REBEL APPLIED ROOFTOP Figure 179 600 MBH 4 Stage ...
Страница 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...
Страница 160: ......
Страница 161: ......