
IM 1287-4 • REBEL APPLIED ROOFTOP 140 www.DaikinApplied.com
Unit Maintenance
Service
The furnace DDC controller has diagnostic information
for troubleshooting the furnace operation. Reference
VB1285 and VB1287 documentation below as applicable.
Maintenance
WARNING
Installation and maintenance must be performed only by qualified personnel
who are trained and experienced with this type of equipment and familiar
with local codes and regulations.
WARNING
Improper installation, adjustment, alteration, service, or maintenance can
cause severe personal injury or death. Read and understand this installation
and maintenance manual thoroughly before installing or servicing this
equipment.
WARNING
Electrical shock and moving machinery hazard.
LOCKOUT/TAGOUT all power sources prior to servicing the equipment.
Electrical shock can cause injury, death, and property damage. More than
one disconnect may be required to de-energize unit. All start-up and service
work must performed only by trained, experience technicians familiar with
this type of equipment. Read and follow the MicroTech controller manual
before operating or servicing. Bond the equipment frame to the building’s
electrical ground through the grounding terminal or other approved means.
CAUTION
Hot surface hazard. May cause minor to moderate personal injury. Allow
burner assembly and chimney flues to cool before servicing equipment.
CAUTION
Prevent snow levels from blocking airflow into the furnace vestibule and
combustion air inlet. Ensure snow does not accumulate and interfere with
the operation of electronics within the vestibule.
Planned maintenance is the best way to avoid unnecessary
expense and inconvenience. Inspect the heating system
at regular intervals by a trained and experienced service
technician. The following service intervals are typical for
average situations but should be adjusted per site conditions.
Fuel pressure and control settings should be made only by
trained and qualified personnel.
Always replace covers on burner controls and boxes as the
electrical contacts. Perform maintenance of controls, gas
valves, and other components in accordance with the furnace
module instruction manual.
Monthly
Check cabinet air filters and replace if dirty. After heavy
snowfall verify that combustion air intakes are not blocked by
snow. Periodically check during periods of snow accumulation
as drifting may also lead to combustion air intake blockage.
Twice Yearly
1.
Combustion Air:
Check combustion inducer fan for dirt
buildup and lint. Check combustion air intake louvers and
flue box/vent for accumulation of dirt and debris.
2.
Cleaning:
Inspect and clean flue tubes and combustion
chamber. Keep burner vestibule clean. Dirt and debris
can result in poor combustion and lower efficiency.
Yearly
1.
Debris:
Check vent terminal screens for blockages and
accumulation.
2.
Heater and the Venting System:
Shall be inspected
once a year by a qualified service agency.
3.
Gas Train:
Check all valves, piping and connections for
leakage with a rich soap solution or UL 913 combustible
gas leak detector. Any bubbling is considered a leak and
must be eliminated. Inspect and clean flame rod, ignition
electrode, and burner manifold.
4.
Condensate Pan and Drain:
Remove any debris that
may have accumulated in the drain pain and drain.
Содержание Rebel Applied DPSA
Страница 15: ...Introduction www DaikinApplied com 15 IM 1287 4 REBEL APPLIED ROOFTOP Figure 17 VFD Inverter Box Components ...
Страница 109: ...Unit Maintenance www DaikinApplied com 109 IM 1287 4 REBEL APPLIED ROOFTOP Figure 159 10kW 50kW Full SCR Control ...
Страница 144: ...IM 1287 4 REBEL APPLIED ROOFTOP 144 www DaikinApplied com Furnace Wiring Diagrams Figure 178 600 MBH 2 Stage ...
Страница 145: ...Furnace Wiring Diagrams www DaikinApplied com 145 IM 1287 4 REBEL APPLIED ROOFTOP Figure 179 600 MBH 4 Stage ...
Страница 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...
Страница 160: ......
Страница 161: ......