5. Operational Test
A. Check before test
Please check the following:
(1) Is wiring correct? Check especially the input and output terminals.
(2) Is there a short-circuit or ground connection on external wiring?
(3) Make sure there is no loosening of screws.
(4) Check external sequence control circuit.
(5) Check voltage of power supply.
B. Operation Method
CT-2000 series inverter unit has both operator panel and external operation
methods.
(1) Operator panel
Panel input
Switch control
(2)External signal operation