Section 7: Operation
7.1 Starting the system
When the installation is complete, make the following checks before starting the system.
Carefully follow the steps outlined in this section to ensure proper startup and operation of the
system.
7.1.1 Checks before operating
1.
The dedicated circuit breaker is switched on.
2.
The cooling water meets requirements of flow rate and temperature range, specified
in Section 5.
3.
Make sure all Aeroquip couplings are securely fastened and the helium flex lines are
oriented correctly (High port to High port, Low port to Low port).
4.
The helium pressure is as follows:
Gauges should read as specified in Section 5 of this manual.
If the pressure is too high, refer to Section 8 of this manual.
If the pressure is too low, refer to Section 8 of this manual
5.
Make sure the cold head motor cord is connected to both the helium compressor
package and the cold head.
6.
Make sure the input power meets the specifications on the identification label.
CAUTION
A voltage deviation of more than 10% above or below the voltage rating can cause helium compressor
motor overheating and possible failure. Indications of voltage operation outside that range will void
the helium compressor warranty.
CAUTION
Operating the cold head in a magnetic field of greater than 500 gauss will void the warranty.
7.1.2 Startup procedure
1.
Switch on power to the helium compressor package at the MAIN BREAKER.
The red OFF light will illuminate.
2.
The compressor may be started by pushing the compressor ON button.
WARNING
The system operates in a closed loop cycle at pressures higher than 200 psig (12.8 bar) and at
temperatures below 120 Kelvin.
Содержание CPA289C
Страница 1: ...CP PT410 CPA289C C Cryocooler PT410 CPA289C INSTALLATION and OPERATION MANUAL ...
Страница 4: ...1 100 D Section 1 Overview ...
Страница 7: ...2 100 C Section 2 Warranty ...
Страница 10: ...3 100 B Section 3 Safety ...
Страница 17: ...4 100 B Section 4 Inspection and Unpacking ...
Страница 20: ...05 PT410 CPA289C B Section 5 Specifications ...
Страница 31: ...Specifications 5 11 Figure 5 6 System I O wiring diagram ...
Страница 32: ...Specifications 5 12 Figure 5 7 System I O wiring diagram external supply ...
Страница 33: ...Specifications 5 13 5 4 Cold head drawing Figure 5 8 Cold Head Drawing ...
Страница 34: ...6 100 E Section 6 Installation ...
Страница 36: ...Installation 6 2 Inspect the cold head Figure 6 2 Outline drawing of standard cold heads A E D C B F ...
Страница 45: ...7 100 C Section 7 Operation ...
Страница 58: ...8 100 C Section 8 Routine Maintenance ...