In the example on the previous page the
correct nozzle
for Tier 1 is the ALBUZ Brown operating at 7 Bar.
In the sample below, the
correct nozzle
for Tier 2 is
the ALBUZ Yellow operating at 7 bar. Note the formula
requires 0.84 L/min, and the nozzle flowchart shows
0.86 L/min. This nozzle with a marginal decrease in
pressure will meet our requirements.
Across the spraying season the variables (such as rates
and speeds) may often change. With a well setup system
small variations will be easily accommodated. Larger
variations may require a change of nozzles.
STEP 7 - FIT & TEST SELECTED NOZZLES
The most important calibration is to test for the actual
litres per hectare achieved through your sprayer.
• Use the following method to fit and test the selected
nozzles:
• Fit selected nozzles to the sprayer.
• Fill your spray tank to overflowing & set the specified
pump pressure and operate the sprayer for a short
period to make sure all lines are full and nozzles
are working properly (no blockages, leaks etc).
• Stop the sprayer and top up the tank with water to
overflowing again.
• Operate the sprayer in the stationary position at the
required pressure for not less than one minute.
• Measure how much water is required to refill the tank
to the brim.
• Now, divide the volume measured by the time taken
(minutes). The longer the test time the more accurate
the figure.
The calculation formulation is;
Output (L/min) =
Output (litres)
Time (minutes)
Example 1, testing Tier 1, refer page 59, step 1.
28.5 litres
1.25 minutes (75 seconds)
= 22.8 litres/min.
Which is slightly more than the target of 22.4L/min
(0.56 L/min per nozzle x 40 nozzles for 1.0 min)
Example 2, testing Tier 2, refer this page, step 1
.
42.1 litres
1.25 minutes (75 seconds)
= 33.7 litres/min.
(note 0.86 L/min per nozzle x 40 nozzles for
1.0 min = 34.4 L/min)
• Excessive output is a sign of worn nozzles.
See steps 8 & 9.
• Insufficient output is a sign of blockages.
See steps 8 & 9.
STEP 8 - CALCULATE THE ACTUAL
APPLICATION RATE
Actual application rate is the objective of setting up and
calibrating your sprayer.
SECTION 7
SPRAYING INFORMATION
Step1:
Enter data in grey boxes
Target rate (L/ha)
650
Speed (km/hr)
7.5
Row spacing (m)
3
Number of rows
1
Number of nozzles
40
Total L/min =
24.375
L/min per nozzle
0.61
Step 2:
Select nozzles from chart
ALBUZ NOZZLE
PART NUMBER
MESH
5 Bar
6 Bar
7 Bar
8 Bar
9 Bar
10 Bar
11 Bar
12 Bar
13 Bar
14 Bar
15 Bar
WHITE
AZ-ATR-WE-80C
100
0.27
0.29
0.32
0.34
0.36
0.38
0.39
0.41
0.43
0.44
0.46
LILAC
AZ-ATR-LC-80C
50
0.36
0.39
0.42
0.45
0.48
0.50
0.52
0.55
0.57
0.59
0.61
BROWN
AZ-ATR-BN-80C
50
0.48
0.52
0.56
0.60
0.64
0.67
0.7
0.73
0.76
0.79
0.81
YELLOW
AZ-ATR-YW-80C
50
0.73
0.80
0.86
0.92
0.97
1.03
1.07
1.12
1.17
1.21
1.25
ORANGE
AZ-ATR-OE-80C
50
0.99
1.08
1.17
1.24
1.32
1.39
1.45
1.51
1.57
1.63
1.69
RED
AZ-ATR-RD-80C
50
1.38
1.51
1.62
1.73
1.83
1.92
2.01
2.09
2.17
2.25
2.33
GREY
AZ-ATR-GY-80C
50
1.5
1.63
1.76
1.87
1.98
2.08
2.17
2.26
2.35
2.43
2.51
GREEN
AZ-ATR-GN-80C
50
1.78
1.94
2.09
2.22
2.35
2.47
2.58
2.69
2.79
2.89
2.99
BLACK
AZ-ATR-BK-80C
50
2
2.18
2.35
2.50
2.64
2.78
2.9
3.03
3.14
3.26
3.36
BLUE
AZ-ATR-BE-80C
50
2.45
2.67
2.87
3.06
3.24
3.40
3.56
3.71
3.85
3.99
4.12
Quantum Mist ALBUZ Nozzle Selection Worksheet
Formula