Operating Instructions
Insulated Conductor Rail System
SinglePowerLine Program 0813
BAL0813-0007-EN
www.conductix.com
translated document
page 96 of 108
9.3
Maintenance plan
The following tasks fall under the "Service" category:
SERVICE
Inspection
Maintenance
Repair
Checks
Washing
Repair
Measurements
Cleaning
Replacement
Tests
Resetting
Readjusting
The separate Maintenance Instruction WV0800-0002 contains the measures required for optimal and trouble-free operation. It also
contains the required maintenance intervals.
The tasks specified and conducted as per the maintenance plan must be logged.
If regular checks reveal increased wear, the required maintenance intervals should be shortened according to the actual signs of
wear.
Contact the manufacturer in case of any questions regarding maintenance tasks and intervals; see the service address on the last
page. The operator must take responsibility for organizing the following maintenance measures to comply with warranty requirements
and for general prevention of damage.
→
Inspection, maintenance and repair measures must only be conducted by trained, qualified technicians!
→
Inspection, maintenance and repair measures must always be documented!
→
It is essential to observe the safety instructions in Section 9.1!
Performance of the maintenance work
→
All maintenance work must be conducted according to the separate Maintenance Instruction WV0800-0002!
→
Maintenance intervals must be observed.
→
The maintenance work must be documented.