Operating Instructions
Insulated Conductor Rail System
SinglePowerLine Program 0813
BAL0813-0007-EN
www.conductix.com
translated document
page 71 of 108
Fig. 94: Slide the anchor clamp to the air gap and tighten the side screws
Fig. 95: Slide the hanger clamp up to the screw on the side of the anchor clamp
→
Place the bridging plate (Pos. 9) over the bolt of the hanger clamp and screw together with the DIN 934 nut (Pos. 13) (14 Nm).
Mount the cover (Pos. 14) onto the hanger clamp using the fastening elements, consisting of washer DIN 9021 (Pos. 12), washer
DIN 125 (Pos. 11) and hexagon M10 nuts (Pos. 10) (8 Nm and Loctite) (Pos. 1) (see Fig. 96).
Fig. 96: Mount the bridging plate
→
Mount all air gaps in the same way.
8
2
8
1
1 3
1 2
9
1 1
1 0
1 3
1 2
1 4
1 1
1 0