Operating Instructions
Insulated Conductor Rail System
SinglePowerLine Program 0813
BAL0813-0007-EN
www.conductix.com
translated document
page 77 of 108
Hanger clamp distance for systems with pickup guides:
When using multiple pole pickup guides, the distance between phases must be reduced from 80 mm (Standard) to 65 mm on the
section shortly before the pickup guide. For this purpose, the 2 to 3 hanger clamps are mounted in front of the pickup guide with a
distance of 65 mm (see Fig. 105).
Fig. 105: System layout for systems with pickup guides
Requirements:
The phase offset of the hanger clamps in front of the pickup guide was reduced from 80 mm to 65 mm.
Distances:
Pickup guide to the first hanger clamp: 560 mm
Required tools:
◼
Rubber mallet
◼
Hexagon screwdriver, SW5
Work steps:
→
The pickup guide is delivered complete with end caps. Push the end caps onto the rails as far as they will go with light mallet
taps and tighten the clamping screws (see Section 6.4.3.10)
NOTE!
→
Observe the reduced distance between phases near the guide area.
→
Use double current collectors with stroke limitation and centering for the guide paths.
→
Remove PE deflector for funnel applications (use drilling template for PE protection against
interchanging).
→
Disconnect the power to the current collector near the transfer and provide on-site
measures for shock protection, such as mounting height, covers, etc.