2-7
Cisco SFS 3504 Multifabric Server Switch Hardware Installation Guide
OL-14325-01
Chapter 2 Preparing to Install
Site Preparation Checklist
4
Grounding evaluation:
•
Circuit breaker size
5
EMI evaluation:
•
Distance limitations for signaling
•
Site wiring
•
RFI levels
Table 2-1
Site Planning Checklist (continued)
Task No.
Planning Activity
Verified By Time
Date