6 - MAINTENANCE
Note S: Have this checked every 6 months by your CASE CONSTRUCTION Dealer.
Note T: When the float reaches the level line (A).
Note U: Periodically.
Note V: Check once a month and have it checked every 6 months by a specialist.
Note W: If the machine is equipped with a hydraulic breaker, it is imperative that the servicing intervals are reduced,
refer to page
6-34
NOTE:
Once the machine has completed 500 hours (then 1000 hours, 1500 hours, etc.) the message "Service due"
will appear on the screen (refer to page
3-18
) by way of a reminder that service work is due. (It is possible to increase
this lapse of time. Consult your CASE CONSTRUCTION Dealer).
6-86
Содержание CX300C
Страница 6: ......
Страница 18: ...1 GENERAL INFORMATION 1 12...
Страница 28: ...2 SAFETY INFORMATION QNTTT2 011B_TU 3 2 10...
Страница 50: ...2 SAFETY INFORMATION 2 32...
Страница 68: ...3 CONTROLS INSTRUMENTS System display and function control panel MUC8LU 034Z 1 MUC8LU 044Z 2 3 18...
Страница 130: ...3 CONTROLS INSTRUMENTS 3 80...
Страница 157: ...4 OPERATING INSTRUCTIONS 4 Operate the arm control to unhook the tool KKZVLU 024A 14 4 27...
Страница 172: ...4 OPERATING INSTRUCTIONS 4 42...
Страница 182: ...5 TRANSPORT OPERATIONS 5 10...
Страница 272: ...6 MAINTENANCE 6 90...
Страница 280: ...8 SPECIFICATIONS Working range 4M8ORU 002A 2 See next page for the values 8 6...
Страница 282: ...8 SPECIFICATIONS 8 8...