Organizing all the wires is not necessary at this
point and will be taken care of in the ‘Tidying Up’
section at the end.
The X and Z motors on the rear of the gantry will
be connected first. Leave their wire leads wrapped
as you found them in the package, we will not need
the extra length for this installation.
The Z-Axis is the TOP motor, and the X-Axis is the
BOTTOM motor. Connect each to their respective
extensions shown in the image below.
Содержание Shapeoko XXL
Страница 16: ...Carbide 3D 2020 All rights reserved...
Страница 46: ...Subscribe Share Carbide 3D 2020 All rights reserved...
Страница 65: ...Carbide 3D 2020 All rights reserved...
Страница 90: ...Carbide 3D 2020 All rights reserved...