The Y-Axis Left Carriage will be bolted to the X-Axis
Extrusion Rail using four (4x) of the M6x12mm
screws.
The bearings on the Y-Axis Left Carriage will ride on
the V-rail of the left Extrusion Rail; this means the
Y-Axis Left Carriage must be bolted to the X-Axis
Extrusion Rail with the bearings facing outward (or
to the left) and the motor pointing in (or to the
right) as shown in the photo below.
Before bolting on the Y-Axis Left Carriage to the X-
Axis Extrusion Rail, place the empty carriage boxes
underneath the X-Axis Extrusion Rail to hold it up
and allow for easier attachment of the Y-Axis Left
Carriage as shown in the image below.
Содержание Shapeoko XXL
Страница 16: ...Carbide 3D 2020 All rights reserved...
Страница 46: ...Subscribe Share Carbide 3D 2020 All rights reserved...
Страница 65: ...Carbide 3D 2020 All rights reserved...
Страница 90: ...Carbide 3D 2020 All rights reserved...