90
Disinfecting Endoscopes
Use the following procedure to prepare an endoscope for disinfecting, to run the disinfection process, and to complete the
disinfection process.
Preparing the endoscope
1. Preclean the endoscope to remove any organic debris. Follow the manufacturer’s instructions for precleaning, or
refer to established professional guidelines. See “Endoscope Precleaning and Testing” in this chapter.
2. Remove all channel valves from the endoscope and connect the ports with appropriate hookup. Refer to the
appropriate MEDIVATORS Hookup Guide for specific endoscope installation.
3. Position the endoscope in the reprocessor basin.
- Position the control section of the endoscope in the right rear of the basin.
- Position the light guide in the left front of the basin.
4. The distal end must not point upwards toward the floating lid.
- The endoscope must be completely submerged when the basin is filled.
- The endoscope must not contact the basin lid.
5. Attach the endoscope hookup connection to the basin connection. Verify there are no kinks in the hookup.
Warning! Periodically test the hookups to ensure there are no blockages and that the
connections are secure. Verify condition of Hookups and replace if worn or damaged.
Caution!
Use only MEDIVATORS supplied hookups with the DSD EDGE
®
endoscope
reprocessor.
Caution!
The hookups are not autoclavable and must be reprocessed by low temperature
disinfection only.
!
!
Содержание MEDIVATORS DSD EDGE
Страница 1: ...1 Service Manual System Version 5 65...
Страница 23: ...23 Figure 5 Function Keys...
Страница 27: ...27 Figure 6 Set Date Screen...
Страница 29: ...29 Figure 7 Set Time Screens...
Страница 31: ...31 Figure 8 Software Version Screen Flash Code Version or Software version Micro controller Code Version...
Страница 33: ...33 Figure 9 Display Log Screen and sample entry...
Страница 42: ...42 Figure 14 Custom Program Setup Screens P1 Detergent Inject Set Minutes 00 00...
Страница 43: ...43 Figure 15 Custom Program Setup Screen...
Страница 51: ...51 Figure 22 Set Delayed Startup Screen...
Страница 54: ...54...
Страница 96: ...96 Notes...
Страница 101: ...101 Figure 4 Depress locking ring Figure 5 Insert tube Figure 6 Locking ring out...
Страница 107: ...107 Figure 14 Install the new water filter Figure 15 Reconnect the water filter Figure 16 Filter installed...
Страница 109: ...109 Figure 17 LCD Display Figure 18 Drain Purge Line Figure 19 Replace Pre filters 1 MICRON 0 45 MICRON...
Страница 111: ...111 Figure 20 Printer compartment Figure 21 Advance paper Figure 22 Feed paper through slot Figure 23 Install new roll...
Страница 115: ...115 Figure 28 Filter locations Figure 29 Disconnect the filter Figure 30 Verify inlet side...
Страница 119: ...119 Figure 33 Fuse locations...
Страница 121: ...121 Figure 34 Connect pressure gauge Figure 35 Bleed some air...
Страница 140: ...140 DSD EDGE W O RECIRC W ADDITIONAL ISOLATION VALVE W CHAMBER FLOW SWITCH HYDRAULIC SCHEMATIC REVISION 02...
Страница 141: ...141...
Страница 142: ...142...
Страница 143: ...143...
Страница 149: ...149...
Страница 150: ...150...
Страница 151: ...151...