2
Operation
Logamax Plus GB062
4
2
Operation
Fig. 1
Hydraulic connections
1
Siphon (condensation) Drain hose
2
Heating flow valve (accessory)
3
Domecti hot water qoutlet
4
Gas valve (closed) (accessory)
5
Drain hose
6
Cold water valve (accessory)
7
Heating return valve (accessory)
8
Filling valve
2.1
Display
Fig. 2
Display
1
Burner operation
2
Fault display/standby mode display
3
Heating mode active
4
DHW heating active
5
Summer mode active
6
Service Mode
7
Temperature display (in °C)
2.2
Before commissioning
B
Adjust pre-charge pressure of expansion vessel to static
head of the heating system.
B
Open the automatic air vent valve (leave open).
B
Open all system radiator valves.
B
Open the cold water valve.
B
Open the cold water valve and one hot water tap until
water flows out.
B
Open the heating flow valve and heating return valve.
B
Fill the heating system to 1 - 2 bar and close the fill valve.
B
Bleed radiators.
B
Top up heating system to pressure of 1 - 2 bar.
B
Check that the gas type specified on the type plate
matches that of the gas supply.
2.3
Switching the appliance on/off
Switching on
B
Start the appliance at the standby key.
The display shows the heating water flow temperature.
Switching off/ standby mode
B
Shut down the appliance at the standby key.
Only the warning symbol continues to be displayed.
B
If the appliance is to be switched off for a longer period of
time: observe correct frost protection procedures.
Fig. 3
0 010 005 789-001
3
2
1
4
5
6
7
NOTICE:
Commissioning without water will
destroy the appliance.
B
Only operate the appliance once it has been
filled with water.
Содержание Logamax GB062-24 KDE H V2
Страница 57: ......