24
TrueSense
t
dirty filter detection operation will not be affected. Press
NEXT
when
the airflow verification check is complete.
If the system has an indoor unit equipped with an updated--version CFM--controlled
blower system (typically found in equipment manufactured after November 2017),
the screen will display the static pressure (in inches) across the equipment at a
pre--determined target airflow CFM. If the achieved (actual) CFM is unacceptably
below the target CFM, a yellow notice will appear to invite the user to see the
associated information screen; equipment operation and the TrueSense
t
dirty filter
detection operation will not be affected. Press
NEXT
when the airflow verification
check is complete.
NOTE
: The airflow verification check occurs at initial installation, or when
FULL
INSTALLATION
or
AIRFLOW VERIFICATION TEST
are selected in the
INSTALLATION & SERVICE
menu.
5.12. Duct Assessment (zoned systems only)
The duct assessment screen will be displayed next for zoned systems. Touch
NEXT
to start Duct Assessment. Duct Assessment will measure the relative size of the
ductwork, up to and through the dampers. These measurements are used to control
the correct amount of airflow in the zoned system. Status messages will appear on
the screen to indicate what the system is doing. The process will take approximately
two minutes per zone. The duct assessment will override a call for heat or cool.
A duct assessment will automatically occur each day at a user selectable time. The
factory default time is 1:00 p.m. local time but, may be changed by entering the
Zoning Setup menu. If there is an active call for heating or cooling, the system will
wait until the call is satisfied before it performs the duct assessment. The system
will first open all zones and drive the blower to 175 CFM/ton of cooling (or the
minimum indoor unit’s airflow, whichever is greater). It will then take a static
pressure measurement. The system will then close all zones and open one zone at a
time, taking a static pressure measurement for each zone.
Содержание Evolution Connex Control
Страница 108: ...99 A160170 NIM Chart...
Страница 109: ...100 A160171 Wiring Diagram Single Stage Non Communicating Heat Pump NIM...
Страница 110: ...101 A160172 Wiring Diagram Two Stage Non Communicating Heat Pump NIM...
Страница 111: ...102 R G FE Fan Coil or Variable Speed Furnace A07114 G Input Wiring for Blower Operation...
Страница 112: ...103 R G FE Fan Coil or Variable Speed Furnace A07115 G Input Wiring for System Shutdown...
Страница 115: ...106 NOTES...