Example: SPP Equipment Summary Screen
A13121B
6.2.
Installation
Touch
INSTALLATION
to perform the start--up process in order to learn all
equipment in system. Select
FULL INSTALLATION
, then touch
NEXT
to initiate
the process.
Touch
Airflow Verification Test
to perform a duct assessment. This can be done if
duct modifications have been made since installation of the Evolution Connex
Control. Duct assessment can be performed without performing a full system
install.
A14222