49
IOM_TIR_STD_gb - Translation of original instructions in Italian - Rev 1_1 - 05/05/2022
20 / 25
BMR_IOM_PPG_ENG_DRAFT_3_nuovagrafica.docx
Install the gearbox by coupling its output shaft with the machine shaft and reposition the shrink
disc.
Gently tighten all the locking screws D of the shrink disc, then tighten in a circular sequence,
progressively increasing the torque up to the value listed in table 5.
Replace the protection cover A, the screws B and the spacers C.
DANGER
Commissioning the gearbox without repositioning the protection cover may cause
entanglement of body parts, causing serious or even fatal injuries.
•
Always remember to reposition the protection cover before commissioning the gearbox, both
after first installation and any maintenance and/or repairs.
Tightening torque for shrink discs [N·m]
KR 010
KR 020
KR 030
KR 040
3.5
4.0
5.0
12
MP/TR MB 080
MP/TR MB 105
MP/TR MB 130
MP/TR MB 160
6.0
6.0
15
15
Table 5 – Tightening torque for shrink discs
5.4.2
VERSION WITH BELT PULLEY
The belt pulley on the output shaft, when included, is normally supplied already assembled.
Should it be necessary to remove the pulley to allow connecting the gearbox to the machine,
follow the instructions below.
Figure 12 – Output shaft with pulley
Identify the pin bolt A, recognizing it from the remaining screws B.
Remove the pin bolt A along with the screws B and remove the pulley C from the output shaft of
the gearbox.
Mark the bores corresponding to the pin bolt on both the pulley C and the output shaft, to make
the subsequent reassembly easier.
Содержание KR
Страница 2: ......
Страница 29: ...29 IOM_TIR_STD_ita istruzioni originali Rev 1_1 05 05 2022...
Страница 55: ...55 IOM_TIR_STD_gb Translation of original instructions in Italian Rev 1_1 05 05 2022...
Страница 57: ......