
- 44 -
MAINTENANCE
GAS CONVERSION
8
GAS CONVERSION
8.1 Warnings
The commissioning of this boiler and
system must only be undertaken by a
professionally qualified person in ac-
cordance with the requirements of the
Gas Safe Installation and Use Regula-
tions and be approved by Gas Safe.
Components used to adapt it to the type
of gas available must be genuine parts
only.
Factory setting = Natural gas
8.2
Procedures
Check that the gas cock (11 in
Fig. 8.1) fitted under the boiler is
turned off and the appliance is
switched off at the mains isolat-
ing spur.
Fig. 8.1
11
Closed
position
• Remove the front panel of the case (see
the section "Dismantling the external pan-
els" to page 46) and lower the control pan-
el (see section "Electrical connections" to
page 31).
• Take off the lid of the sealed chamber.
• Unscrew the connector A (Fig. 8.2), re-
move the fixing fork B and remove the pipe
C (Fig. 8.3).
Fig. 8.2
A
Fig. 8.3
B
C
• Carry out the conversion for the type of
gas, replacing the restrictors gas correctly
(Fig. 8.4).