Biasi RIVA ADVANCE HE M110B.24SR/C Скачать руководство пользователя страница 26

- 26 -

INST

ALLA

TION

- 26 -

INST

ALLA

TION

GENERAL REQUIREMENTS

The point of connection to the electricity sup-
ply must be readily accessible and adjacent 
to the appliance except were the appliance is 
installed in a bathroom this must then be sited 
outside the bathroom.

Содержание RIVA ADVANCE HE M110B.24SR/C

Страница 1: ...Wall hung fanflue roomsealed high efficiency gas boiler User manual and Installation instructions RIVA ADVANCE HE Models G C Appl No M110B 24SR C 41 583 07...

Страница 2: ...water systems in the UK and to encourage regular servicing to optimise safety efficiency and performance Benchmark is managed and promoted by the Heating and Hot water Industry Council For more infor...

Страница 3: ...otified to Local Area Building Control either directly or through a Competent Persons Scheme A Building Regulations Compliance Certificate will then be issued to the customer who should on receipt wri...

Страница 4: ...pply system com patible with its performance and output can be used only for those purposes for which it has been specially designed must not be touched by children or by those unfamiliar with its ope...

Страница 5: ...al attention must be sought following eye contact or prolonged reddening of the skin Thermostat Temperature gauge Description Sealed phial and capillary containing liquid Known hazards irritating to s...

Страница 6: ...and installation debris It is also sensible to initially fire and commission the boiler before connecting any external controls such as a room thermostat By following this procedure if you have a subs...

Страница 7: ...6 Lighting the boiler 39 7 7 Checking the gas supply pressure 39 7 8 Maximum output in c h mode 41 7 9 External temperature probe setting optional 41 7 10 Checking the ignition device 42 7 11 Checking...

Страница 8: ...essure gauge 5 Lock out signal lamp 6 Lockout reset button 7 Function selector and c h temp control knob 8 D h w temperature control knob 9 Appliance operation lights 1 3 Isolation valves Provide for...

Страница 9: ...ombination observed is not included in the above table a fault may be indicated Reference should be made to the following table In this case switch off the boiler as de scribed in section Extinguishin...

Страница 10: ...ed on pressure gauge 4 is not lower than that shown in Fig 2 2 If the pressure reading on the pressure gauge is below that shown in Fig 2 2 then the sys tem will require topping up A filling loop is n...

Страница 11: ...ance operation light 9 Fig 2 4 will flash every 4 seconds stand by condition To operate the boiler position the function selector 7 as in Fig 2 4 The appliance op eration light 9 will flash every 2 se...

Страница 12: ...temperature In this case the boiler must be properly set by the Installer section External temperature probe setting optional to page 40 and the c h flow temperature control knob 7 must be positioned...

Страница 13: ...he obstruction by pouring hot water over the exposed pipe an cleaning any blockage from the end of the pipe If this fails to remedy the problem the assist ance of a Gas Safe registered installer or in...

Страница 14: ...below the correct setting If required top up the system correctly as described in the section Refilling proce dure to page 10 Bleed any air present in the radiators if necessary If the pressure on th...

Страница 15: ...15 INSTALLATION TECHNICAL INFORMATION 4 TECHNICAL INFORMATION 4 1 Overview Fig 4 1 33 17 31 27 26 22 18 24 15 21 25 28 32 14 29 23 30 20 19 16 34...

Страница 16: ...w pipe 14 Condensing heat exchanger 15 C h temperature probe NTC 16 Condensing heat exchanger 17 Safety thermostat 18 Flame detecting electrode 19 Transformer 20 Air manifold 21 C h pressure relief va...

Страница 17: ...rap 29 Fan 30 Spark generator 31 Ignition electrode 32 Burner 33 Flue temperature probe NTC 34 Safety thermal fuse 35 Gas valve inlet pressure test point 36 Gas valve outlet pressure test point 37 C h...

Страница 18: ...ar 2 5 Minimum pressure kPa 30 bar 0 3 Available head in 1000 l h kPa 23 bar 0 23 Seasonal efficiency C band A 90 2 Gas supply pressures Gas Pa mbar Natural G20 Nom 2000 Min 1700 17 Max 2500 25 Propan...

Страница 19: ...um heat input of 6 0 kW A E Other flue gas figures At nominal heat input non condensing O2 content 4 3 4 3 CO content ppm 200 Exhaust temperature D C 85 Other specifications Height mm 803 Width mm 400...

Страница 20: ...the boiler in the event that the flow around the central heating circuit is restricted due to closure of thermostatic or system control valves 4 5 Expansion vessel Note this boiler is designed for ope...

Страница 21: ...mplete a Declaration of Conformity to indicate compliance to I S 813 2002 This appliance must be installed by a com petent person in accordance with the Gas Safety installation Use Regulations 5 1 Rel...

Страница 22: ...tion that might occur to building products in the vicini ty In cold and or humid weather water vapour may condense on leaving the flue terminal the effect of such steaming must be consid ered Pluming...

Страница 23: ...compartment it is not necessary to provide additional ventilation for cooling for this particular product Howev er consideration must be given to clearance requirements for maintenance section Pre cau...

Страница 24: ...d have a gradient to ensure air is carried naturally to air release points and water flows naturally to drain taps The appliance has a built in automatic air release valve it should be ensured as far...

Страница 25: ...as frequent filling of the system could cause pre mature scaling of the heat exchanger 5 9 Water treatment C h circuit Where a new boiler is fitted to a new system with either plastic or copper pipes...

Страница 26: ...ON GENERAL REQUIREMENTS The point of connection to the electricity sup ply must be readily accessible and adjacent to the appliance except were the appliance is installed in a bathroom this must then...

Страница 27: ...er Refer to section Electrical connections to page 31 in this chapter for the electrical connections In no circumstances will the manufac turer be held responsible if the warnings and instructions con...

Страница 28: ...ions for fitting the exhaust fume duct are complied with refer to the leaflet includ ed with the flue kit packed separately Utilise the paper template supplied with the boiler to determine the fixing...

Страница 29: ...in the air brake connected to the drainage pipework See also section Condensate drain to page 23 Fig 6 4 L 12 6 7 Fitting the flue system Refer to the assembly instructions con tained within the chose...

Страница 30: ...and the equivalent flue length must not ex ceed 10 metres Elbows 45 90 Fig 6 5 C Coaxial 60 100 mm Elbow kits enable the standard flue kits to be offset to overcome obstructions or ensure the correct...

Страница 31: ...ended to a total overall maximum per missible length of 10 m Optional 45 and 90 elbows can be used to offset the flue route Each additional elbow reduces the overall acceptable length of the flue syst...

Страница 32: ...M N O N Remove the side panels or move the lower part of the side panels as indicated in Fig 6 11 and pull the control panel When com pletely pulled out the panel can rotate 45 downwards to facilitate...

Страница 33: ...own in Fig 6 14 or Fig 6 15 Fig 6 14 Power supply terminal block External controls terminal block T Room thermostat L N 3 2 1 230V rating Do not connect live wires to ter minals to which the room ther...

Страница 34: ...c control of heat ing and hot water Fig 6 19 and Fig 6 20 are divided in two parts The upper shows the single compo nents used on the diagrams with their con nection to the 10 way junction box The bol...

Страница 35: ...ol terminal block Room thermostat A B 5 4 Cylinder thermostat C 1 2 8 7 6 GY WH OR GRYE BU 2 3 8 5 7 MAINS 230V a c Switched 3 Amp fused spur L N 2 3 1 Programmer HTG HW OFF HW ON L N 2 1 4 6 7 Power...

Страница 36: ...hermostat link Room thermostat A B 4 5 Cylinder thermostat C 1 2 8 7 6 GY WH OR GRYE BU 2 3 8 5 7 MAINS 230V a c Switched 3 Amp fused spur L N 2 3 1 Programmer HTG HW OFF HW ON L N 2 1 4 6 7 Power sup...

Страница 37: ...ary electrical system checks to en sure electrical safety shall be carried out by a competent person i e polarity earth con tinuity resistance to earth and short circuit If a fault has occurred on the...

Страница 38: ...ing procedure must be in line with BS7593 2006 Treatment of Water in d h w c h Systems When the installation and second fill ing are completed turn on the c h sys tem and run it until the temperature...

Страница 39: ...h every 2 seconds Fig 7 6 9 7 6 5 The boiler will now go through an ignition sequence and the burner will light If after four ignition attempts about four minutes the boiler fails to light the boiler...

Страница 40: ...witching on the fused spur isolation switch The appliance operation light 9 will flash every 4 seconds Set the function knob 7 as illustrated in Fig 7 8 Fig 7 8 9 7 6 5 Read the inlet pressure value a...

Страница 41: ...n Fig 7 9 Fig 7 9 20 30 40 50 60 70 80 External temperature C C h flow temperature C 20 15 10 5 0 5 10 15 20 25 K 4 K 3 K 2 K 1 K 0 5 K 1 5 K 6 The appropriate value of the coefficient K depends on th...

Страница 42: ...or a coefficient K set to 1 5 is illustrated in Fig 7 14 Fig 7 14 20 30 40 50 60 70 80 External temperature C C h flow temperature C 20 15 10 5 0 5 10 15 20 25 K 1 5 15 C 15 C 7 10 Checking the igniti...

Страница 43: ...use and adjustment of all system controls this will ensure the great est possible fuel economy Explain the function and use of the function selector Explain and demonstrate the function of time and t...

Страница 44: ...8 2 Procedures Check that the gas cock 11 in Fig 8 1 fitted under the boiler is turned off and the appliance is switched off at the mains isolat ing spur Fig 8 1 11 Closed position Remove the front pa...

Страница 45: ...7 6 5 Disconnect the C h temperature probe NTC 15 in Fig 8 6 Fig 8 6 15 Keep pressed the reset button 6 for about 10 seconds until the lock out signal lamp 5 blinks Connect the C h temperature probe...

Страница 46: ...Fig 8 8 By turning the knob 8 the lock out signal lamp 5 blinks quickly 2 per seconds indicating that the setting has changed and must be memorised To memorize the setting keep pressed the reset butto...

Страница 47: ...on switch adjacent to the appliance and turn off the gas cock before carrying out any procedures whatsoever for cleaning maintenance opening or dismantling boiler panels The Engineer should complete t...

Страница 48: ...e front and side panels of the case Remove the sealed chamber lid Disconnect the connectors of the ignition electrodes E and detection electrode F Fig 9 5 Fig 9 5 D E F G H H Disconnect the rubber pip...

Страница 49: ...rations de scribed in the section Cleaning the con densing heat exchanger and burner to page 47 9 8 Checking the flue Have the integrity of the flue outlet pipe 39on page 17 air intake pipe 40on page...

Страница 50: ...ect the customer s statutory rights If yes and if required by the manufacturer has a water scale reducer been fitted Condensing Boilers only The condensate drain has been installed in accordance with...

Страница 51: ...er Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone...

Страница 52: ...1796215290 17962 1529 0 0312 52A5 UK Biasi UK Ltd Commercial Road Leamore Enterprise Park WALSALL WS2 7NQ Sales Tel 01922 714600 Tech Service Tel 01922 714636 www biasi co uk 16 01 2012 N...

Отзывы: