
Planning for Installation
Plexus 9000 Planning and Engineering Guide
Issue 5, January 24, 2003
Section 130-200-000
6-28 Telica,
Inc.
√
Task
Details, see …
Warning:
Risk of equipment damage. Not all mounting
positions are suitable for all styles of racks. To reduce
the risk, ensure that the mounting position is appropriate
to the rack in which the Plexus 9000 will be installed
_
Determine the mounting position of the chassis.
Paragraph
Warning:
Risk of personal injury and equipment
damage. To reduce the risk, never install the chassis in a
rack that has not been stabilized by being bolted to the
floor and to the ceiling
.
_
Check that the rack is ready to support the chassis and all its
components; racks must be secured to the floor.
Paragraph
_
Check the location and cable length requirements for the direct
connection of a local or remote console, if needed.
_
Check the location and network cable requirements for the
network connection of a network management system, if needed.
_
Plan for building the required power, chassis ground, and I/O
cables.
Paragraphs
Warning:
Never allow the Plexus 9000 or any of its
components to be installed or serviced by anyone except
a qualified (trained) service person. Ensure that a
second engineer is available to secure the chassis to the
rack during installation
.